The harbour crane jib structure bears most of the weight when positioning a load, and its length determines the maximum reach of a crane. Transporting oversized components requires maximum safety. The hoist can move a total weight of up to 100 tonnes.
The complete hoist with two rope outlets is delivered fixed to a mounting frame. The components are electrically wired to a terminal box and ready for connection.
